In Stage 16 we’re ready to do the lazer level bit so it all sits level

The water bed frame is constructed and ‘in situ’. I’m ready to use the lazer level to set all the heights and levels in our water bed and pool to pond.

The second liner layer is in and bonded to the pool. The pool has had it’s second coat of sealer.

httpv://www.youtube.com/watch?v=J6W2fDYa94k

 

 

 

 

Avatar photo

Peter Butler

A passionate person known to be a serious “hobbiest” with a must for drinking only G.O.D Coffee (Ground On Demand). Just love “Making Websites Work”, hence “Smarter Websites” by converting dead dormant websites into profitable websites… one at a time if necessary!

Leave a Comment

Your email address will not be published. Required fields are marked *

Call Now Button